Garage Planning

One of the projects on the horizon for spring is to figure out how to shoehorn my new compressor into an already crowded garage. It’s pretty clear I’ve got to put it along the back wall, but there’s no power back there and that area is full of other stuff. I’ve had to stack stuff one top of stuff because there’s no place else to put it, which makes me unhappy. If I can get rid of the first compressor, that frees up a pile of space under the workbench, which I can then rebuild into shelving. That should free up floor space and the puzzle pieces will fit better.

The first order of business will be to extend power to the back corner. I’ve got two circuits in the garage currently, switched power up over the ceiling for reclaimed fluorescent lights and unswitched power going behind the workbench. It’s pretty obvious that I’ve got to extend the unswitched power further back so that I can run the old fridge and the compressor next to it under the window. This means I’ve got to move a pile of parts, including my spare hood, to other locations.

One of the things I haven’t really been taking advantage of is the space up in the attic, which is currently filled with piles of unbacked insulation from the front porch project. There’s a lot of space up front that I can use for stashing things I don’t need during the summer (when the hardtop goes up on the lift, it blocks the access door) but I have to get rid of that insulation first. Baltimore County has a program where they’ll accept donated materials, and all of this insulation is pretty clean as far as I remember, so when there’s a warm spell, I’m going to get a paper suit, haul it all down, and bag it for donation.

First up on the accessories list for the compressor will be a filter for the outgoing air. Next, a good impact driver and a set of sockets. I’ll probably hit Harbor Freight for that. In the spring I’ll pick up a sandblaster attachment so that I can start blasting parts clean. Finally, a decent HPLV gun will give me the ability to spray decent paint on those parts and get them ready for hanging.

Posted on   |    |  Posted in Future Plans

Leave a Reply

Your email address will not be published. Required fields are marked *

You may use these HTML tags and attributes:

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>