Having spent seven full days on a serious sheet metal project, here are my takeaways:
You can never have too many angle grinders. I’ve got three, and I ran a cutoff, grinding, and wire wheel primarily. If I had to do it over again, I’d have a fourth with a flap disc. The brand is unimportant; two of mine are the cheapest Harbor Freight models sold, and that’s what I’ll buy for the fourth. A splitter block for the extension cord is also key. Making sure the grinding wheel isn’t dull saves a ton of time.
Conversely, Harbor Freight sells a long pneumatic 3″ cutoff wheel which I found to be absolutely useless. It wasn’t strong enough to cut through anything and spent most of the time in the box. However their 2″ pneumatic orbital sander came in super-handy for tight areas.
My Eastwood 140 MIG was absolutely outstanding. It’s an inverter type so it’s easy to carry and move around, and the controls were dialed in perfectly. I’d bought an extra spool of wire but found I didn’t need it, which was a shock given how much wire I was using to fill things. I would recommend this welder to anyone.
My garage is small, uneven, and filled with stuff, so I worked out in the driveway for the majority of the project. I have a plastic folding table which became my workbench, and with an assortment of clamps and cardboard it worked out perfectly.
Having a fridge out in the garage was also key. Cold drinks throughout the day were essential for keeping cool and hydrated.
If I’d had more time, I would have taken the entire dashboard and heating unit out of the truck. I did try to remove the heater, but wound up spilling coolant all over the fucking place, and I still couldn’t figure out how it was supposed to come out, which put me behind schedule. So I re-connected it all and worked around it. It can be done, but I wish I could have done it better.
I don’t have a planishing hammer or beanbags (proper metal-beating tools) but I made do with an old Plomb hammer, a rubber mallet, a deadblow hammer, and Dad’s old green vise. I also screwed a Harbor Freight metal brake I got at a yard sale to the floor of the garage and used that for the larger bends, once I sourced a fat piece of aluminum bar for the backing plate. With those simple tools I was able to bend all of the metal exactly how I needed to. I’m going to have to figure something out for when I need to bend metal to replace the floorboards, as they’re wider than the 32″ brake, but I’ll cross that bridge when I come to it.
Patience is key. I got carried away with my tack welds when I burned in the main vent sections, and they warped. I slowed down when I did the outer cowl repairs, and had better results. When I do repairs to the outer sheet metal I’m going to have to force myself to slow way down and take my time. This will be especially true when I put the cowl back on—I’m going to have to walk back and forth from one side to the other until it’s all done.
I’ve hung the front fenders on the truck with a single bolt for the last several months, and it makes things much, much easier to pull them off when I’ve got to get close to the engine. I have no idea when they’ll go back on semi-permanently (both of them will be replaced when I can source better ones) but for now they’ll remain temporarily tacked in place until I’m ready to button everything up for a while.
After all of this, I’m not afraid of sheet metal repairs at all—unless they involve compound curves I can’t replicate. There’s a section of rust behind the driver’s rear wheel that I can’t wait to dig into once the cowl is complete. But I would love to fool around with an english wheel and a bender…
I desperately want a larger garage, with a cement floor and a long, well lit workbench.
This project was exhausting. I was gifted with the most reasonable weather I could have hoped for—averaging 80˚ and sunny, with a constant breeze blowing through the yard. If this had been a normal August in Maryland, I’d only be halfway done and in the hospital with heat exhaustion. Even so, I came inside each evening and pretty much collapsed; my watch tells me I averaged about 4 miles of walking and ~8,000 steps a day. I would start immediately after walking Hazel and work until it got too dark to see. Big huge thanks to Jen and Finn for giving me the space to focus on this exclusively.
This was the most fun I’ve had on a project in a long, long time, and I’m very satisfied with how it turned out.
Neal in Boston says:
All I can say is bravo! I love to hear the joy of your work and figure things out come through in your blog and that is especially so with this welding and fabrication project. Hopefully you’ll be able to square away some big chunks of time for the rest through the fall.