Here’s a compilation of work I’ve done on the trucks before and after our vacation, starting from the heater box, moving through electrical, and finishing with some welding on the heater box.
I’ve gotten the wiring to the point where the dashboard is in the truck but I can’t hook everything up permanently for want of two rubber grommets for the smaller bulkhead connectors and several Packard 56 connectors I don’t already have, so I ordered a handful more this afternoon in the hopes that they’ll be here by the weekend.
The heater box came out more easily than I thought it would, and is in better shape than I was expecting, but still required repair. I cut two sections of metal out and welded new metal in, and bathed the interior in Rust Converter until I ran out (I’ll be picking more of that up this weekend). Once that’s completely treated it needs a skim coat of mud to cover the divots and bumps, and then I’ll paint it up and get it ready to re-assemble. I think I’ve found a local paint shop who can scan my existing paint color and mix me a pint to match. I’ve also got to figure out why the blower motor won’t work when I test it on 12v bench power and source some more coolant hose.
The other thing I ordered were a set of floor mats for the Scout, knowing that we’ll be driving through the August heat to Indiana. I figure having something else between us and the engine heat will be well appreciated. And, having something to cover the heat matting will also be welcome. I’m hopeful they’ll be here in time, but they’re handmade and the maker estimates 3-4 weeks before they ship, so it may be a futile exercise. We’ll see.